Decision details

S/2679/19/RM - Cottenham (Land off Rampton Road)

Decision Maker: Planning Committee, Development and Conservation Control Committee (see also Planning Committee)

Is Key decision?: No

Is subject to call in?: No

Purpose:

All planning applications for Cottenham considered by the Planning Committee since May 2003. For individual reports, please click on the “Meeting” tab above. For further details on all Cottenham planning applications, please visit our Planning Applications Database and select Cottenham from the drop-down list of parishes.

Decisions:

Members noted that this was a duplicate application to application reference S/2549/19/RM (Minute 7 of the meeting held on 12 February 2020 refers).

 

By way of confirmation, and by seven votes to three, the Planning Committee resolved to approve the application subject to the Conditions and informatives contained in the report from the Joint Director of Planning and Economic Development and, by five votes to one with three abstentions, to the addition of the following Condition:

 

“No development shall begin until a surface water drainage scheme for the site, based on sustainable drainage principles, has been submitted to and approved in writing by the Local Planning Authority. The scheme shall subsequently be implemented in accordance with the approved details before the relevant part of the

scheme (including all strategic elements which will benefit all dwellings) and that part which is particular to an individual dwelling shall subsequently be implemented in accordance with the approved details before an application is made for a final certificate for building regulation purposes and no dwellings shall be occupied unless the relevant part of the said scheme has been implemented to the reasonable satisfaction of the Local Planning Authority.  The scheme shall be based upon the principles within the agreed Flood Risk Assessment (FRA) prepared by Enzygo (ref: SHF.1132.024.HY.R.001.G dated August 2016 and shall also include: -

i) Full calculations detailing the existing surface water runoff rates for the QBAR, 3.3 % Annual Exceedance Probability (AEP) (1 in 30) and 1% AEP (1 in 100) storm events.

ii) Full results of the proposed drainage system modelling in the above-referenced storm events (as well as 1% AEP plus climate change) , inclusive of all collection, conveyance, storage, flow control and disposal elements and including an allowance for urban creep, together with an assessment of system performance.

iii) Detailed drawings of the entire proposed surface water drainage system, including

levels, gradients, dimensions and pipe reference numbers.

iv) Full details of the proposed attenuation and flow control measures.

v) Site Investigation and test results to confirm infiltration rates.

vi) Details of overland flood flow routes in the event of system exceedance, with demonstration that such flows can be appropriately managed on site without increasing flood risk to occupants.

vii) Full details of the maintenance/adoption of the surface water drainage system.

viii) Measures taken to prevent pollution of the receiving groundwater and/or surface water.

The drainage scheme must adhere to the hierarchy of drainage options as outlined in the NPPF PPG.

(Reason - To ensure a satisfactory method of surface water drainage and to prevent the increased risk of flooding in accordance with Policy CC/8 of the adopted Local Plan 2018.)”

(Councillors John Batchelor, Bradnam, Cahn, Fane, Heylings, Milnes and Rippeth voted in favour. Councillors Roberts, Heather Williams and Wright voted against)

 

Publication date: 03/03/2020

Date of decision: 12/02/2020

Decided at meeting: 12/02/2020 - Planning Committee