Agenda item

Waterbeach New Town Supplementary Planning Document

Decision:

Cabinet

 

(a)             Approved the draft Supplementary Planning Documentary (SPD) for Regulation 13 public consultation in accordance with the Town and Country Planning (Local Planning) (England) Regulations 2012 for a period of six weeks;

 

(b)             Approved the consultation arrangements set out in the Consultation Statement (Appendix 2);

 

(c)             delegated authority to the Joint Director of Planning and Economic Development in consultation with the Deputy Leader, to make editorial changes to the draft Waterbeach New Town SPD and supporting documents prior to the commencement of the consultation period (to comprise minor amendments and factual updates and clarifications); and

 

(d)             agreed amendments to the Infrastructure Delivery Plan entry on page 125 and 126 of the draft SPD in respect of the foul water network as set out in Appendix 2.

 

Minutes:

Cabinet considered a report seeking its agreement for the draft Waterbeach New Town Supplementary Planning Document to be published for consultation.

 

Following a summary of comments from the Scrutiny and Overview Committee, and further discussion, Cabinet

 

(a)             Approved the draft Supplementary Planning Documentary (SPD) for Regulation 13 public consultation in accordance with the Town and Country Planning (Local Planning) (England) Regulations 2012 for a period of six weeks;

 

(b)             Approved the consultation arrangements set out in the Consultation Statement (Appendix 2);

 

(c)             delegated authority to the Joint Director of Planning and Economic Development in consultation with the Deputy Leader, to make editorial changes to the draft Waterbeach New Town SPD and supporting documents prior to the commencement of the consultation period (to comprise minor amendments and factual updates and clarifications); and

 

(d)             agreed amendments to the Infrastructure Delivery Plan entry on page 125 and 126 of the draft SPD in respect of the foul water network as set out in Appendix 2.

 

Supporting documents: